  • Revival of R-12A Platform with EPS and complete topside facilities including complete Oil & Gas process System along with Separators, LQ Modules, HVAC, STP, Deck Crane, Solar Panels with battery bank, etc.
  • Installation of the Burner Boom with King Post Rig - PN III.
  • Revamping of GS#23 Offshore alongwith the RTU system UG IG System, HIPPS, Solar panels with battery bank, etc. at KG Basin East Coast of India.
  • Decommissioning, Dismantling, Removal, Installation & Commissioning of the Gas Injection System at Neelam Heera Fields 18 unmanned platforms Mumbai High.
  • Surface facility for the Artificial Lift System at LB Platform suvalli.
  • Revamping of GDU at NQ Platform in the MH Asset.