Email:
[email protected]
|
+918879085934
|
:
+918879085934
Follow us on:
Home
About Us
Certificates
Services
Design Engineering
Pressure Vessel Fabrication
EPC
Site Fabrication
Dry Dock repairs
Heavy Construction Activities
DNV Certifified SKID
Offshore heavy installation
Installation & Commissioning
Construction
Projects
E-Catalouge
Enquiry
Contact Us
Critical Projects Executed
Dry Dock repair of the Rig Sagar Gaurav within 1 year in the Pandemic period April 2020 - Client ONGC.
Repair of high Pressure Production Separator under ASME “R” Stamp at the MoPU KGB in field B80 within 3 months -replacement of 3 nozzles, repair of 11 nozzles plus correction of the internal weld over lay cladding – Client Expro.
In -situ replacement of the 30 mtrs Sump Caisson– Client ONGC
Underwater Free Span Correction of Piping at Suvali - Client Vedanta Ltd (Cairn India) – 20 Spans corrected within 45 days (Tide available was maximum 40 minutes per tide 2 tides per day)
Supply of the Vertical Flaring system 60’ and 40’ with Knock out Drum for the end-user ONGC, Cairn India and OIL through M/s. Superior Energy Services.
Repair and installation of Decks, solar panels, heavy structure, etc damaged during Cyclone Taukate of 100 jackets at MH Assest – Client- ONGC.
Supply of 2 sets of 60’ Burner Boom within 25 days – M/s. Halliburton Offshore Services.
Jacket Strengthening at HD and HQ Platform at elevation of -31 mtrs and -54 mtrs – M/s. ONGC
Supply of Skid mounted electrically operated Batch Mixer 100 bbl 2 sets – M/s. ADESH for ONGC
Deck Extension of the LB Platform for the installation of Artifical Lifting System – M/s. Cairn India
Completion of Surface facility for the Artificial lift System at LB Platform – M/s. Cairn India
Copyright © 2024 | Carlton Industries
To Download Catelog Please Fill Below Form
×
Required field
Envalid Email
Required field
Should contain only 10 digits
Required field
Required field