Critical Projects Executed


  • Dry Dock repair of the Rig Sagar Gaurav within 1 year in the Pandemic period April 2020 - Client ONGC.
  • Repair of high Pressure Production Separator under ASME “R” Stamp at the MoPU KGB in field B80 within 3 months -replacement of 3 nozzles, repair of 11 nozzles plus correction of the internal weld over lay cladding – Client Expro.
  • In -situ replacement of the 30 mtrs Sump Caisson– Client ONGC
  • Underwater Free Span Correction of Piping at Suvali - Client Vedanta Ltd (Cairn India) – 20 Spans corrected within 45 days (Tide available was maximum 40 minutes per tide 2 tides per day)
  • Supply of the Vertical Flaring system 60’ and 40’ with Knock out Drum for the end-user ONGC, Cairn India and OIL through M/s. Superior Energy Services.
  • Repair and installation of Decks, solar panels, heavy structure, etc damaged during Cyclone Taukate of 100 jackets at MH Assest – Client- ONGC.
  • Supply of 2 sets of 60’ Burner Boom within 25 days – M/s. Halliburton Offshore Services.
  • Jacket Strengthening at HD and HQ Platform at elevation of -31 mtrs and -54 mtrs – M/s. ONGC
  • Supply of Skid mounted electrically operated Batch Mixer 100 bbl 2 sets – M/s. ADESH for ONGC
  • Deck Extension of the LB Platform for the installation of Artifical Lifting System – M/s. Cairn India
  • Completion of Surface facility for the Artificial lift System at LB Platform – M/s. Cairn India

 