New Page 2
 

   
New Page 2
 

 

   
Major Work Executed By Carlton Industrial Engineers:

 No.

ITEM

COMPANY

PERIOD

VALUE
(In Rs. Lacs.)

01.

Raw Water Tower

Jindal Drilling Industries

Oct’ 94 – Mar’ 95

27.65

02.

Raw Water Tower

Saipem Drilling

Aug’ 99 – Sep’ 99

  32.36

03.

Repair/ Upgrading Of PN – III

Saipem Drilling

Apr’ 00 – May’ 00

212.00

04.

Flare Boom With Structural Design. Approval from DNV, Singapore

Saipem Drilling

Oct’04 – Jan’05

149.00

05.

Repairing Plate

Noble Drilling

Jun’ 98

20.25

06.

Sea Water Tower

Essar Oil & Gas

Sep’ 95 – Nov’ 95

15.69

07.

Hull Renewal on Rigs

Oil & Natural Gas Co. Ltd.

Aug’ 99 – Jul’ 00

135.00

08.

Raw Water Tower of S/Uday (ABS Certification)

Oil & Natural Gas Co. Ltd.

End 01 – Mid 02

  80.00

09.

Hull Renewal on Various Rigs on Rate Contract (ABS Certification.)

Oil & Natural Gas Co. Ltd.

Aug’ 02 – Cont.

200.00

 

10.

Spud Can of Rig S/Gaurav (ABS Certification)

Oil & Natural Gas Co. Ltd.

Dec’ 2002

 46.00

11.

Offshore Oil & Gas Burner Boom

Oil & Natural Gas Co. Ltd.

Aug’ 03 – Sep’ 03

22.00

12.

Leg Repair of jack up rig Sagar Pragati

Oil & Natural Gas Co. Ltd.

      Dec.05 – Mar.06

2500.00

13.

 

Oil & Natural Gas Co. Ltd.

Aug’06 – Jul’07

1400.00

14.

Raw Water Tower

The Great Eastern Shipping Co. Ltd.

Sep’ 93 – Mar’ 94

66.00

15.

Interior of Barge Accommodation

The Great Eastern Shipping Co. Ltd.

Jul’ 99 – Aug’ 99

25.00

16.

Preload Tank & Piping

The Great Eastern Shipping Co. Ltd.

Jul’ 99 – Aug’ 99

42.00

17.

Raw Water Tower

Hitech Drilling

Sep’ 93- Mar’ 94

31.42

18.

Staging Works in 3 Phase at ROP

Bhabha Atomic Research Centre

Jan’03 – May’05

148.00

19.

Oil Storage Tank Of 70kl & 45kl Capacity

Hydrocarbon Resource Development Co. P. Ltd.

Sept’ 02 – Nov’ 02

11.00

20.

Hand Railings (15.00 KM) Fab. and Installation.

Ballast Nedam Internaional B. V.

Jul’ 02 – Cont.

100.00

21.

Construction & Supply of Jet A1 Fuel Transport Tanks Fitted with MS Cage (DNV Certification)

B G Exploration & Production India Ltd.

Sep’ 02 – Oct’ 02

8.00

22.

Vessel’s layup for reairs on OSV on Samudrika - 3

South India Corporation (Agencies) Ltd.

May’02 – Jul’ 04

39.00

23.

Fabrication & Installation Of Burner Boom – CET/ JTA/ FGM

Transocean Sedco – Forex Int. Drilling Inc.

Apr’ 02 – Oct’ 02

60.00

24.

Burner Boom Fabrication & Installation for TR- II & FG Mcclintock

Transocean Sedco – Forex Int. Drilling Inc.

Mar’ 03 – Nov’ 03

51.00

25.

Fabrication of 3 Phase Separator 300 # with Skid

Hindustan Oil Exploration Corporation Ltd.

Sep’ 03 – Nov’ 03

3.00

26.

Burner Head Assembly With Pilot Ignition System Along With Accessories / Fittings

Aban Loyd Chiles Offshore Ltd.

Jan’ 03 – Feb’ 03

7.00

 

Top

Services
Major Work
   
 
 
Contact us
 
Office:

221, Bussa Industrial Estate, Century Bazar Lane,
Prabhadevi ,

Mumbai  - 400 025.
 

Tel.:

+91-22-2422 2096
+91-22-2432 9628

 

   
Copyrights © Carlton Industrial
Copyrights © 09 - 10Carlton Industrial Engineers.

Website designed by OVERTURES Infotech